欢迎进入欧博网址(Allbet Gaming),欧博网址www.ALLbetgame.us开放会员注册、代理开户、电脑客户端下载、苹果安卓下载等业务。

首页体育正文

Fukushima debris removal delayed by another year

admin2022-08-284

皇冠官方appwww.hg108.vip)是一个开放皇冠官方代理APP下载、皇冠官方会员APP下载、皇冠官方线路APP下载、皇冠官方登录APP下载的官方平台。皇冠体育官方APP上最新登录线路、新2皇冠官方网址更新最快。皇冠体育官方APP开放皇冠官方会员注册、皇冠官方代理开户等业务。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

新2正网会员开户www.hg108.vip)是一个开放皇冠正网即时比分、新2正网会员开户开户的平台。新2正网会员开户平台(www.hg108.vip)提供最新皇冠登录,皇冠APP下载包含新皇冠体育代理、会员APP,提供皇冠正网代理开户、皇冠正网会员开户业务。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。

网友评论